GOVERNMENT CONTRACT / DELIVERY ORDER
THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURD
Awarded to DEFENSE SYSTEMS AND SOLUTIONS
- Company legal name
- DEFENSE SYSTEMS AND SOLUTIONS
- UEI / CAGE
- NWKQVQED4C81 / Not reported
- Parent award
- Not reported
- Awarding agency
- Department of Defense
- Subagency
- Department of the Army
- Industry
- Other
- NAICS
- 336413
- PSC
- 1905
- Performance period
- Not reported — Not reported
- Recipient address
- 631 DISCOVERY DR, HUNTSVILLE, MADISON, AL, 35806
- Place of performance
- HUNTSVILLE, MADISON, AL, 35806
- Source last modified
- Nov 3, 2026
Description
THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURDON TUBE PRESSURE SWITCHES.
Derived from official transactions
Contract lifecycle
- Award announced
THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURD
- Option exercised
THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURD
- Value increased
THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURD
Point-in-time model
Contract change outlook
Uncollapsed source history
Transactions and modifications
| Action date | Modification | Action type | Exact obligation | Current total | Potential total | Description | Source |
|---|---|---|---|---|---|---|---|
| Aug 8, 2019 | 0 | Not reported | $558,733.00 | Not reported | Not reported | THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ACCOMPLISH THE NONRECURRING ENGINEERING WARFARE CENTER (NUWC). OPTION 1 DEFINES THE TESTING REQUIREMENTS FOR THE BOURDON TUBE PRESSURE SWITCHES. | USAspending ↗ |