GOVERNMENT CONTRACT / DELIVERY ORDER
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN
Awarded to TRI-TECHNIC INC
- Company legal name
- TRI-TECHNIC INC
- UEI / CAGE
- JFLYJKT6N2L5 / Not reported
- Parent award
- Not reported
- Awarding agency
- National Aeronautics and Space Administration
- Subagency
- National Aeronautics and Space Administration
- Industry
- Construction
- NAICS
- 236220
- PSC
- Y1JZ
- Performance period
- Not reported — Not reported
- Recipient address
- 185 S FAIRVIEW LN, SONORA, TUOLUMNE, CA, 95370
- Place of performance
- MOFFETT FIELD, SANTA CLARA, CA, 94035
- Source last modified
- Oct 21, 2026
Description
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN THE AREA OF WORK PROVIDE ELECTRIC POWER FOR MECHANICAL EQUIPMENT ANCHOR WATER TREATMENT EQUIPMENT INSTALL AND ASSEMBLE WATER TREATMENT SYSTEM PROTECT RAISED FLOOR AND OTHER EXISTING FINISHES COORDINATE WORK SCHEDULE WITH CONTRACTING OFFICER REPRESENTATIVE (COR) AND BUILDING USER PROVIDE PUMPS WITH SPECIFIED WATER FLOW TEST QUALITY CRITERIA FROM WATER TREATMENT SYSTEM FOR COMPONENTS LISTED IN THE D-WAVE COMPUTER WATER QUALITY CRITERIA, AS NOTED IN THE DWGS. SUBMIT WATER QUALITY LAB REPORT FOR REVIEW COMMISSION TREATMENT SYSTEM KEEP DUST TO MINIMUM AND CLEAN UP EACH DAY. PERFORM FUNCTIONAL TEST BY APPROVED THIRD PARTY INDEPENDENT TEST AND BALANCING AGENCY PLAN WORK AND PERFORM WORK WITH EXTRA CAUTION TO AVOID ANY INTERRUPTION TO THE OPERATION OF THE QUANTUM COMPUTER. COMMUNICATE ALL WORK TASK AND SCHEDULES TO THE COR COMPLY WITH ALL SAFETY REQUIREMENTS SUBMIT SAFETY PLAN, WORK PLAN, COMMISSIONING PLAN, PROGRAMMING, FIELD TEST REPORTS, INTEGRATED SYSTEM TEST REPORT, VALIDATION REPORT, AND AS-BUILT DOCUMENTATION TO COR. FOR MORE INFORMATION SEE ATTACHED PERFORMANCE SCOPE OF WORK, DRAWINGS, AND ATTACHMENTS
Derived from official transactions
Contract lifecycle
- Contract modified
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN
- Value increased
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN
- Award announced
IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF
- Value increased
IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF
Point-in-time model
Contract change outlook
Uncollapsed source history
Transactions and modifications
| Action date | Modification | Action type | Exact obligation | Current total | Potential total | Description | Source |
|---|---|---|---|---|---|---|---|
| Mar 24, 2016 | 5 | D | $3,808.00 | Not reported | Not reported | IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN THE AREA OF WORK PROVIDE ELECTRIC POWER FOR MECHANICAL EQUIPMENT ANCHOR WATER TREATMENT EQUIPMENT INSTALL AND ASSEMBLE WATER TREATMENT SYSTEM PROTECT RAISED FLOOR AND OTHER EXISTING FINISHES COORDINATE WORK SCHEDULE WITH CONTRACTING OFFICER REPRESENTATIVE (COR) AND BUILDING USER PROVIDE PUMPS WITH SPECIFIED WATER FLOW TEST QUALITY CRITERIA FROM WATER TREATMENT SYSTEM FOR COMPONENTS LISTED IN THE D-WAVE COMPUTER WATER QUALITY CRITERIA, AS NOTED IN THE DWGS. SUBMIT WATER QUALITY LAB REPORT FOR REVIEW COMMISSION TREATMENT SYSTEM KEEP DUST TO MINIMUM AND CLEAN UP EACH DAY. PERFORM FUNCTIONAL TEST BY APPROVED THIRD PARTY INDEPENDENT TEST AND BALANCING AGENCY PLAN WORK AND PERFORM WORK WITH EXTRA CAUTION TO AVOID ANY INTERRUPTION TO THE OPERATION OF THE QUANTUM COMPUTER. COMMUNICATE ALL WORK TASK AND SCHEDULES TO THE COR COMPLY WITH ALL SAFETY REQUIREMENTS SUBMIT SAFETY PLAN, WORK PLAN, COMMISSIONING PLAN, PROGRAMMING, FIELD TEST REPORTS, INTEGRATED SYSTEM TEST REPORT, VALIDATION REPORT, AND AS-BUILT DOCUMENTATION TO COR. FOR MORE INFORMATION SEE ATTACHED PERFORMANCE SCOPE OF WORK, DRAWINGS, AND ATTACHMENTS | USAspending ↗ |
| Jun 26, 2015 | 0 | Not reported | $40,990.00 | Not reported | Not reported | IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT; VERIFY EXISTING CONDITIONS IN THE AREA OF WORK; PROVIDE ELECTRIC POWER FOR MECHANICAL EQUIPMENT; ANCHOR WATER TREATMENT EQUIPMENT; INSTALL AND ASSEMBLE WATER TREATMENT SYSTEM; PROTECT RAISED FLOOR AND OTHER EXISTING FINISHES. | USAspending ↗ |