GOVERNMENT CONTRACT / DELIVERY ORDER
THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. CONTRACTOR SHALL USE LANGLEY'S QUANTUM MECHANICAL MODEL, WHERE APPLICABLE, TO PREDICT LASER MATERIAL CANDIDATES.
Awarded to NATIONAL INSTITUTE OF AEROSPACE ASSOCIATES
- Company legal name
- NATIONAL INSTITUTE OF AEROSPACE ASSOCIATES
- UEI / CAGE
- SLMPURD4W9U9 / Not reported
- Parent award
- Not reported
- Awarding agency
- National Aeronautics and Space Administration
- Subagency
- National Aeronautics and Space Administration
- Industry
- Space & Satellite
- NAICS
- 541712
- PSC
- AR11
- Performance period
- Not reported — Not reported
- Recipient address
- 100 EXPLORATION WAY, HAMPTON, HAMPTON (CITY), VA, 23666
- Place of performance
- HAMPTON, HAMPTON CITY, VA, 23666
- Source last modified
- Nov 3, 2026
Description
THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. CONTRACTOR SHALL USE LANGLEY'S QUANTUM MECHANICAL MODEL, WHERE APPLICABLE, TO PREDICT LASER MATERIAL CANDIDATES. THE GOVERNMENT WILL EDUCATE THE CONTRACTOR REGARDING THE USE OF THE QUANTUM MECHANICAL MODEL. ELEMENTS PR, SM, AND DY ARE OF INTEREST AND VARIOUS HOST SHALL NEED TO BE DETERMINED. THE LANTHANIDE ATOMS IN YAG SHALL BE USED TO START THE PROCESS AND SHALL PROVIDE INFORMATION ON THE ENERGY LEVELS. THE CONTRACTOR SHALL ALSO INVESTIGATE LANTHANIDE DOPED LOW PHONON FLUORIDE MATERIALS. THE CONTRACTOR SHALL CONTACT VENDORS AND DETERMINE THE AVAILABILITY OF SPECTROSCOPY SAMPLES. 3.2. THE CONTRACTOR SHALL OPERATE A GOVERNMENT FURNISHED MID INFRARED SPECTROMETER TO MEASURE ABSORPTION AND FLUORESCENCE SPECTRA OF THE CANDIDATE LASER MATERIALS. THE CONTRACTOR SHALL USE VARIOUS PUMP LASERS FOR MEASURE THE DECAY TIME. THE CONTRACTOR SHALL RECORD AND ANALYZE THE DECAY TIME AND THE SPECTRA OF VARIOUS MATERIAL CANDIDATES. THE CONTRACTOR SHALL USE THIS INFORMATION TO VERIFY THE QUANTUM MECHANICAL MODEL PREDICTIONS THAT SERVE AS INPUT PARAMETERS FOR LASER MODELS. 3.3. THE CONTRACTOR SHALL DEVELOP LASER MODELS AND OPTIMIZE LASER CONFIGURATION FOR THE MID-IR LASER OPERATION WITH THE CANDIDATE LASER MATERIALS.
Derived from official transactions
Contract lifecycle
- Award announced
THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. CONTRACTOR SHALL USE LANGLEY'S QUANTUM MECHANICAL MODEL, WHERE APPLICABLE, TO PREDICT LASER MATERIAL CANDIDATES.
- Value decreased
THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. CONTRACTOR SHALL USE LANGLEY'S QUANTUM MECHANICAL MODEL, WHERE APPLICABLE, TO PREDICT LASER MATERIAL CANDIDATES.
- Contract modified
THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. CONTRACTOR SHALL USE LANGLEY'S QUANTUM MECHANICAL MODEL, WHERE APPLICABLE, TO PREDICT LASER MATERIAL CANDIDATES.
Point-in-time model
Contract change outlook
Uncollapsed source history
Transactions and modifications
| Action date | Modification | Action type | Exact obligation | Current total | Potential total | Description | Source |
|---|---|---|---|---|---|---|---|
| Mar 24, 2022 | 4 | C | -$30,215.79 | Not reported | Not reported | THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. CONTRACTOR SHALL USE LANGLEY'S QUANTUM MECHANICAL MODEL, WHERE APPLICABLE, TO PREDICT LASER MATERIAL CANDIDATES. THE GOVERNMENT WILL EDUCATE THE CONTRACTOR REGARDING THE USE OF THE QUANTUM MECHANICAL MODEL. ELEMENTS PR, SM, AND DY ARE OF INTEREST AND VARIOUS HOST SHALL NEED TO BE DETERMINED. THE LANTHANIDE ATOMS IN YAG SHALL BE USED TO START THE PROCESS AND SHALL PROVIDE INFORMATION ON THE ENERGY LEVELS. THE CONTRACTOR SHALL ALSO INVESTIGATE LANTHANIDE DOPED LOW PHONON FLUORIDE MATERIALS. THE CONTRACTOR SHALL CONTACT VENDORS AND DETERMINE THE AVAILABILITY OF SPECTROSCOPY SAMPLES. 3.2. THE CONTRACTOR SHALL OPERATE A GOVERNMENT FURNISHED MID INFRARED SPECTROMETER TO MEASURE ABSORPTION AND FLUORESCENCE SPECTRA OF THE CANDIDATE LASER MATERIALS. THE CONTRACTOR SHALL USE VARIOUS PUMP LASERS FOR MEASURE THE DECAY TIME. THE CONTRACTOR SHALL RECORD AND ANALYZE THE DECAY TIME AND THE SPECTRA OF VARIOUS MATERIAL CANDIDATES. THE CONTRACTOR SHALL USE THIS INFORMATION TO VERIFY THE QUANTUM MECHANICAL MODEL PREDICTIONS THAT SERVE AS INPUT PARAMETERS FOR LASER MODELS. 3.3. THE CONTRACTOR SHALL DEVELOP LASER MODELS AND OPTIMIZE LASER CONFIGURATION FOR THE MID-IR LASER OPERATION WITH THE CANDIDATE LASER MATERIALS. | USAspending ↗ |