FIRMQUARRYResearch workspace

GOVERNMENT CONTRACT / DELIVERY ORDER

DESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE

Awarded to WSP-MH JV

PIID FA468626FA001US · USAspendingOther
$444.5K
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligation$444,544sum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateMay 5, 2026
Company legal name
WSP-MH JV
UEI / CAGE
ZETTKX6WXUA5 / Not reported
Parent award
Not reported
Awarding agency
Department of Defense
Subagency
Department of the Air Force
Industry
Other
NAICS
541330
PSC
C219
Performance period
Not reported — Not reported
Recipient address
1015 HALF ST SE STE 650, WASHINGTON, DISTRICT OF COLUMBIA, DC, 20003
Place of performance
BEALE AFB, YUBA, CA, 95903
Source last modified
Oct 23, 2026

Description

DESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE, 65% DESIGN, 95 DESIGN, AND 100 IFC DESIGN COMPLETE.

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Contract modified

    DESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE

    US · usaspendingSource ↗
  2. Contract modified

    DESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE

    US · usaspendingSource ↗
  3. Award announced

    DESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE

    US · usaspendingSource ↗
  4. Value increased

    DESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE

    US · usaspending$444.5KSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Jun 17, 2026P00002DNot reportedNot reportedNot reportedDESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE, 65% DESIGN, 95 DESIGN, AND 100 IFC DESIGN COMPLETE.USAspending ↗
May 6, 2026P00001MNot reportedNot reportedNot reportedDESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE, 65% DESIGN, 95 DESIGN, AND 100 IFC DESIGN COMPLETE.USAspending ↗
May 5, 20260Not reported$444,543.55Not reportedNot reportedDESIGN FOR A DESIGN-BID-BUILD PROJECT FOR B.1204 WITH FOUR DESIGN PHASES CONSISTING OF 35% DESIGN INCLUDING THE CHARRETTE REPORT, CONCEPTUAL PLAN, BASES OF DESIGN AND COST ESTIMATE, 65% DESIGN, 95 DESIGN, AND 100 IFC DESIGN COMPLETE.USAspending ↗