GOVERNMENT CONTRACT / DEFINITIVE CONTRACT
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
Awarded to DOBCO INC
- Company legal name
- DOBCO INC
- UEI / CAGE
- CAG6H3QWFWV6 / Not reported
- Parent award
- Not reported
- Awarding agency
- Department of Defense
- Subagency
- Department of the Army
- Industry
- Construction
- NAICS
- 236220
- PSC
- Y1CZ
- Performance period
- Not reported — Not reported
- Recipient address
- 1 GEOFFREY WAY, WAYNE, PASSAIC, NJ, 07470
- Place of performance
- WEST POINT, ORANGE, NY, 10996
- Source last modified
- Oct 23, 2026
Description
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
Derived from official transactions
Contract lifecycle
- Contract modified
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
- Value increased
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
- Award announced
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
- Contract modified
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
- Value increased
CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS.
Point-in-time model
Contract change outlook
Uncollapsed source history
Transactions and modifications
| Action date | Modification | Action type | Exact obligation | Current total | Potential total | Description | Source |
|---|---|---|---|---|---|---|---|
| Jun 25, 2026 | A00045 | B | $495,389.34 | Not reported | Not reported | CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS. | USAspending ↗ |
| May 18, 2026 | P00015 | D | $2,949,960.47 | Not reported | Not reported | CONSTRUCTION OF A 136,000 SF ENGINEERING CENTER CONSISTING OF A FOUR LEVEL ABOVE GRADE STONE CLAD STEEL FRAMED STRUCTURE WITH TWO BELOW GRADE PARKING LEVELS. | USAspending ↗ |