FIRMQUARRYResearch workspace

GOVERNMENT CONTRACT / DEFINITIVE CONTRACT

*REPLACE HVAC UNITS THROUGHOUT THE FACILITY, INCLUDING CAB ROOFTOP UNIT, BASE BUILDING ROOFTOP UNIT, AND MULTIPLE PTAC UNITS. *PROVIDE AND INSTALL TWO ELECTRIC UNIT HEATERS (EUH) *

Awarded to M. E. TAFOYA ENTERPRISES, INC.

PIID 6973GH25C00043US · USAspendingConstruction
Not reported
Data last updated Oct 22, 2026 · Source: USAspending
Transaction obligationNot reportedsum disclosed on award record
Current contract valueNot reportednot interchangeable with obligation
Potential contract valueNot reportedincluding options if reported
Award dateJan 6, 2025
Company legal name
M. E. TAFOYA ENTERPRISES, INC.
UEI / CAGE
KUEHM76YKM65 / Not reported
Parent award
Not reported
Awarding agency
Department of Transportation
Subagency
Federal Aviation Administration
Industry
Construction
NAICS
236220
PSC
Z2BA
Performance period
Not reported — Not reported
Recipient address
561 EMERSON ST, EL PASO, EL PASO, TX, 79915
Place of performance
BEVERLY, ESSEX, MA, 01915
Source last modified
Oct 23, 2026

Description

*REPLACE HVAC UNITS THROUGHOUT THE FACILITY, INCLUDING CAB ROOFTOP UNIT, BASE BUILDING ROOFTOP UNIT, AND MULTIPLE PTAC UNITS. *PROVIDE AND INSTALL TWO ELECTRIC UNIT HEATERS (EUH) *APPLY PROTECTIVE ELASTOMERIC ROOFING COAT TO PROTECT THE EXISTING RO

View federal source ↗

Derived from official transactions

Contract lifecycle

  1. Award announced

    *REPLACE HVAC UNITS THROUGHOUT THE FACILITY, INCLUDING CAB ROOFTOP UNIT, BASE BUILDING ROOFTOP UNIT, AND MULTIPLE PTAC UNITS. *PROVIDE AND INSTALL TWO ELECTRIC UNIT HEATERS (EUH) *

    US · usaspendingSource ↗
  2. Contract modified

    *REPLACE HVAC UNITS THROUGHOUT THE FACILITY, INCLUDING CAB ROOFTOP UNIT, BASE BUILDING ROOFTOP UNIT, AND MULTIPLE PTAC UNITS. *PROVIDE AND INSTALL TWO ELECTRIC UNIT HEATERS (EUH) *

    US · usaspendingSource ↗

Point-in-time model

Contract change outlook

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Uncollapsed source history

Transactions and modifications

Action dateModificationAction typeExact obligationCurrent totalPotential totalDescriptionSource
Mar 2, 2026P00001DNot reportedNot reportedNot reported*REPLACE HVAC UNITS THROUGHOUT THE FACILITY, INCLUDING CAB ROOFTOP UNIT, BASE BUILDING ROOFTOP UNIT, AND MULTIPLE PTAC UNITS. *PROVIDE AND INSTALL TWO ELECTRIC UNIT HEATERS (EUH) *APPLY PROTECTIVE ELASTOMERIC ROOFING COAT TO PROTECT THE EXISTING ROUSAspending ↗