FIRMQUARRYResearch workspace

US_FEDERAL process · buyer country US · award

"STUDIES OF MATERIAL DAMAGE THROUGH NON-DESTRUCTIVE TECHNIQUES" THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. PARTICIPATE AND CONTRIBUTE TO THE PROJECT PLANNIN

National Aeronautics and Space Administration

Procedure CONT_AWD_NNL14AA69T_8000_NNL13AA08B_8000CPV 541712Space & Satellite
Not reported
Data last updated Oct 22, 2026 · Source: USAspending.gov
Buyer identifier
Not reported
Procurement method
Not reported
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
Not reported
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

"STUDIES OF MATERIAL DAMAGE THROUGH NON-DESTRUCTIVE TECHNIQUES" THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. PARTICIPATE AND CONTRIBUTE TO THE PROJECT PLANNING OF THE NDE AND AE WORK. 3.2. PERFORM NDE AND AE TESTING, DESIGNING THE TEST PROCEDURE, SETTING UP THE TEST, ACQUIRING THE DATA, AND EVALUATING OF THE DATA DERIVED FROM AERONAUTICAL AND AEROSPACE STRUCTURES. 3.2.1. INVESTIGATE THE RELATIONSHIPS BETWEEN NDE AND AE SIGNALS, (THEIR SPECTRAL INDICATIONS, ENERGY LEVELS, AND RATES OF OCCURRENCES) AND INDICATIONS OF MATERIAL YIELDING, DAMAGE GROWTH, AND SUBSEQUENT ULTIMATE FAILURE, SUCH AS STRESS RUPTURE FAILURE AND THE SUBSEQUENT RELEASE OF AE ENERGY. 3.2.2. SEEK CAUSAL EFFECTS THAT CAN ALLOW NDE OR AE TO BE USED AS A POTENTIAL STRUCTURAL HEALTH MONITORING METHODOLOGY TO PRESAGE FAILURE OF PARTS, ALLOWING STRUCTURAL AND MATERIAL ENGINEERS TO PREDICT REMAINING LIFE OF A PART WHEN POSSIBLE AND TO AVOID CATASTROPHIC FAILURE, WHICH COULD RESULT IN LOSS OF MISSION OR LIFE. 3.2.3. INVESTIGATE THE INTEGRATION OF MULTIPLE AE METHODS AND POSSIBLY OTHER POTENTIAL NDE METHODOLOGIES THAT COULD COME TO BEAR ON HEALTH MONITORING OF SPACE STRUCTURES. 3.3. PARTICIPATE ON TELECONFERENCES AND INTERNAL NASA MEETINGS TO DISCUSS RESULTS AND RESEARCH. 3.4. PREPARE, SUBMIT, AND PRESENT AN INTERIM RESULTS REPORT. THE FORMAT OF THE REPORT AND DATE OF THE PRESENTATION WILL BE COORDINATED WITH THE TM.

Suppliers

Official lifecycle

Process timeline

  1. Award announced

    "STUDIES OF MATERIAL DAMAGE THROUGH NON-DESTRUCTIVE TECHNIQUES" THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. PARTICIPATE AND CONTRIBUTE TO THE PROJECT PLANNIN

    US · usaspendingSource ↗
  2. Value decreased

    "STUDIES OF MATERIAL DAMAGE THROUGH NON-DESTRUCTIVE TECHNIQUES" THE CONTRACTOR SHALL PERFORM THE FOLLOWING TASK REQUIREMENTS:3.1. PARTICIPATE AND CONTRIBUTE TO THE PROJECT PLANNIN

    US · usaspending-$1.7KSource ↗

Auditable model output

Predictive intelligence

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Append-only source history

Source records

RecordDateStagesFetched