FIRMQUARRYResearch workspace

EU_TED process · buyer country NOR · tender

The centre of Tjøme - stage 3

Færder kommune

Procedure 550a5058-c332-4775-8387-81c58dcf37deCPV 45231300Construction
Not reported
Data last updated Oct 22, 2026 · Source: Tenders Electronic Daily
Buyer identifier
TED_ORGANISATION: 817263992
Primary supplier
Not reported
Procurement method
Not reported
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
Not reported
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

Background and purpose Færder municipality plans to separate the old AF system to waste water and surface water as well as lay new water pipelines in the centre of Tjøme, stage 3. The work will include excavation work, rock drilling and renovation of the hose. The contract work is divided into two phases; an interaction phase first and then the execution phase. This contract includes all works with new water and sewage installations as shown on the attached drawings, as well as the re-establishment of affected roads. There shall be continual operation of the existing pipeline installations all days throughout the entire construction period. The pipeline route and manhole placement are in the plans that have been prepared. It is anticipated that the ditches will consist of both uncompacted trenches and rock trenches. The trench depth varies from 2.0 to 3.0 metres, with specific locations up to 5.5 metres. The works mainly comprise: approx. 2,170 m complete main trenches of varying width and height. delivery/laying of approx. 1,730 m surface water pipelines delivery/laying of approx. 1,750 m sewage sewage delivery/laying of approx. 2,170 m water pipelines salvage drilling for surface water of approx. 95 m renovating the hose of approx. 480 m 28 complete wastewater manholes 27 complete surface water manholes 23 complete water manholes re-establishment of roads facilitating space for temporary stores. The work will be carried out as a general contract/main contract. Building form 8405 A "Form for contract for the execution of building and construction work" shall be used.

Suppliers

    Official lifecycle

    Process timeline

    1. tender_changed

      The centre of Tjøme - stage 3

      NOR · eu_tedSource ↗
    2. tender_changed

      The centre of Tjøme - stage 3

      NOR · eu_tedSource ↗

    Notice versions

    PublicationVersionTypeDateSource
    757799-20261cn-standardNov 2, 2026Official notice ↗ · XML ↗
    755718-20261cn-standardOct 30, 2026Official notice ↗ · XML ↗

    Lots

    LotCPVPerformanceNUTSValue
    LOT-000145231300, 45232453, 45232440, 45232130, 45232100, 45232411, 45232420, 45232410, 45231100, 45232400, 45232450, 45231300, 45232453, 45232440, 45232130, 45232100, 45232411, 45232420, 45232410, 45231100, 45232400, 45232450NORNO093Not reported

    Auditable model output

    Predictive intelligence

    Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

    Append-only source history

    Source records

    RecordDateStagesFetched
    87eca81d-4bce-46e1-a2b9-e3ac85f44bdf:1Nov 2, 2026tender_changedNov 3, 2026
    804fe399-d71d-4aef-b144-baf91063d2ee:1Oct 30, 2026tender_changedOct 31, 2026