FIRMQUARRYResearch workspace

US_FEDERAL process · buyer country US · award

IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN

National Aeronautics and Space Administration

Procedure CONT_AWD_NNA15BB51T_8000_NNA14AA08B_8000CPV 236220Not reported
Not reported
Data last updated Oct 22, 2026 · Source: USAspending.gov
Buyer identifier
Not reported
Primary supplier
TRI-TECHNIC INC
Procurement method
Not reported
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
Not reported
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN THE AREA OF WORK PROVIDE ELECTRIC POWER FOR MECHANICAL EQUIPMENT ANCHOR WATER TREATMENT EQUIPMENT INSTALL AND ASSEMBLE WATER TREATMENT SYSTEM PROTECT RAISED FLOOR AND OTHER EXISTING FINISHES COORDINATE WORK SCHEDULE WITH CONTRACTING OFFICER REPRESENTATIVE (COR) AND BUILDING USER PROVIDE PUMPS WITH SPECIFIED WATER FLOW TEST QUALITY CRITERIA FROM WATER TREATMENT SYSTEM FOR COMPONENTS LISTED IN THE D-WAVE COMPUTER WATER QUALITY CRITERIA, AS NOTED IN THE DWGS. SUBMIT WATER QUALITY LAB REPORT FOR REVIEW COMMISSION TREATMENT SYSTEM KEEP DUST TO MINIMUM AND CLEAN UP EACH DAY. PERFORM FUNCTIONAL TEST BY APPROVED THIRD PARTY INDEPENDENT TEST AND BALANCING AGENCY PLAN WORK AND PERFORM WORK WITH EXTRA CAUTION TO AVOID ANY INTERRUPTION TO THE OPERATION OF THE QUANTUM COMPUTER. COMMUNICATE ALL WORK TASK AND SCHEDULES TO THE COR COMPLY WITH ALL SAFETY REQUIREMENTS SUBMIT SAFETY PLAN, WORK PLAN, COMMISSIONING PLAN, PROGRAMMING, FIELD TEST REPORTS, INTEGRATED SYSTEM TEST REPORT, VALIDATION REPORT, AND AS-BUILT DOCUMENTATION TO COR. FOR MORE INFORMATION SEE ATTACHED PERFORMANCE SCOPE OF WORK, DRAWINGS, AND ATTACHMENTS

Suppliers

Official lifecycle

Process timeline

  1. Contract modified

    IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN

    US · usaspendingSource ↗
  2. Value increased

    IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN

    US · usaspending$3.8KSource ↗
  3. Award announced

    IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF

    US · usaspendingSource ↗
  4. Value increased

    IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF

    US · usaspending$41KSource ↗

Auditable model output

Predictive intelligence

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Append-only source history

Source records

RecordDateStagesFetched