US_FEDERAL process · buyer country US · award
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN
National Aeronautics and Space Administration
- Buyer identifier
- Not reported
- Primary supplier
- TRI-TECHNIC INC
- Procurement method
- Not reported
- Tender deadline
- Not reported
- Contract period
- Not reported — Not reported
- Native value
- Not reported
- USD comparison
- Not shown — no auditable FX observation
- Official source
- Open notice ↗
Description
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN THE AREA OF WORK PROVIDE ELECTRIC POWER FOR MECHANICAL EQUIPMENT ANCHOR WATER TREATMENT EQUIPMENT INSTALL AND ASSEMBLE WATER TREATMENT SYSTEM PROTECT RAISED FLOOR AND OTHER EXISTING FINISHES COORDINATE WORK SCHEDULE WITH CONTRACTING OFFICER REPRESENTATIVE (COR) AND BUILDING USER PROVIDE PUMPS WITH SPECIFIED WATER FLOW TEST QUALITY CRITERIA FROM WATER TREATMENT SYSTEM FOR COMPONENTS LISTED IN THE D-WAVE COMPUTER WATER QUALITY CRITERIA, AS NOTED IN THE DWGS. SUBMIT WATER QUALITY LAB REPORT FOR REVIEW COMMISSION TREATMENT SYSTEM KEEP DUST TO MINIMUM AND CLEAN UP EACH DAY. PERFORM FUNCTIONAL TEST BY APPROVED THIRD PARTY INDEPENDENT TEST AND BALANCING AGENCY PLAN WORK AND PERFORM WORK WITH EXTRA CAUTION TO AVOID ANY INTERRUPTION TO THE OPERATION OF THE QUANTUM COMPUTER. COMMUNICATE ALL WORK TASK AND SCHEDULES TO THE COR COMPLY WITH ALL SAFETY REQUIREMENTS SUBMIT SAFETY PLAN, WORK PLAN, COMMISSIONING PLAN, PROGRAMMING, FIELD TEST REPORTS, INTEGRATED SYSTEM TEST REPORT, VALIDATION REPORT, AND AS-BUILT DOCUMENTATION TO COR. FOR MORE INFORMATION SEE ATTACHED PERFORMANCE SCOPE OF WORK, DRAWINGS, AND ATTACHMENTS
Suppliers
- TRI-TECHNIC INC · primary
Official lifecycle
Process timeline
- Contract modified
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN
- Value increased
IGF::OT::IGF THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF WATER TREATMENT UNIT VERIFY EXISTING CONDITIONS IN
- Award announced
IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF
- Value increased
IGF::OT::IGF D-WAVE WATER FILTRATION SYSTEM FOR Q-COMPUTER, N258 THE WORK TO BE PERFORMED UNDER THIS PROJECT CONSISTS OF THE FOLLOWING: LAYOUT AND INSTALL PIPING FOR CONNECTION OF
Auditable model output
Predictive intelligence
Append-only source history
Source records
| Record | Date | Stages | Fetched |
|---|