UK_FTS process · buyer country GB · contract
GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
Guildford Borough Council
- Buyer identifier
- GB-PPON: PRYN-3355-CPMV
- Primary supplier
- Natta Building Company Ltd
- Procurement method
- Competitive flexible procedure
- Tender deadline
- Not reported
- Contract period
- Not reported — Not reported
- Native value
- GBP 10,399,903.38
- USD comparison
- Not shown — no auditable FX observation
- Official source
- Open notice ↗
Description
The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring. • Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoil stripping • Sitewide remediation of contamination (where required) • Site platform and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins • Surface water outfalls • Utility infrastructure, ducting, chambers, pipework • Highway formations • Signage, markings, street furniture, street lighting • Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements • S278 Junction Works • Maintain the reptile translocation fencing and associated inspections Location Location of Project: • Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG. • Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE. • Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to; • Ground water monitoring. • Other works may be occurring adjacent to the site on the wider master site plan. • Ecological watching brief by an independent ecologist • Archaeological watching brief by an independent archaeologist • Utilities works / diversions (which do not form part of the Scope of these works). • General s278 Highways works • Works associated with the relocation of the Sewerage Treatment Works • Off site demolitions
Suppliers
- Natta Building Company Ltd · primary
Official lifecycle
Process timeline
- Award announced
GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
- Contract signed
GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
Auditable model output
Predictive intelligence
Append-only source history
Source records
| Record | Date | Stages | Fetched |
|---|---|---|---|
| 100476-2026 | Oct 23, 2026 | award, contract | Oct 23, 2026 |