FIRMQUARRYResearch workspace

UK_FTS process · buyer country GB · planning

Design & Build of Long Welded Rail Trains

NETWORK RAIL INFRASTRUCTURE LIMITED

Procedure ocds-h6vhtk-06d7fdCPV 34621000Not reported
GBP 140,153,344.43
Data last updated Oct 22, 2026 · Source: Find a Tender OCDS
Buyer identifier
GB-PPON: PNZN-9524-VCQJ
Primary supplier
Not reported
Procurement method
Competitive flexible procedure
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
GBP 140,153,344.43
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

Network Rail's existing fleet of Rail Delivery Trains (RDTs) and Long-Welded Rail Trains (LWRTs) is approaching the point at which replacement options must be considered. Network Rail currently anticipates a future requirement for: • A fleet of approximately 8 + 3 LWRTs. • A locomotive-hauled solution capable of both rail delivery and rail recovery activities. • A solution capable of carrying a minimum of 24 rails per train. • Remote operation of rail handling equipment to minimise manual intervention and improve operational safety. Engagement was undertaken with the market to date has identified several opportunities for consideration as part of the sourcing strategy and technical requirements, including separate procurement of wagons and material handling equipment (MHE), and the development of a modular design making use of intermodal wagons. This procurement shall be for the Manual Handling Equipment, design and build, as a modular solution. This will then be entegrated with the chosen UK approved wagon to ultimatley build the LWRT.

Suppliers

    Official lifecycle

    Process timeline

    1. Planned

      Design & Build of Long Welded Rail Trains

      GB · uk_find_a_tenderGBP 140,153,344.43Source ↗

    Auditable model output

    Predictive intelligence

    Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

    Append-only source history

    Source records

    RecordDateStagesFetched
    103511-2026Nov 2, 2026planningNov 2, 2026