FIRMQUARRYResearch workspace

US_FEDERAL process · buyer country US · award

THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.

Department of Defense

Procedure CONT_AWD_FA309922F0007_9700_FA890321D0039_9700CPV 541330Other
Not reported
Data last updated Oct 22, 2026 · Source: USAspending.gov
Buyer identifier
Not reported
Procurement method
Not reported
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
Not reported
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.

Suppliers

Official lifecycle

Process timeline

  1. Contract modified

    THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO EXTEND THE POP BY 55 CALENDAR DAYS. THE REASON FOR THIS TIME EXTENSION IS TO ACCOUNT FOR TIME NEEDED TO INCORPORATE DIV 01 SPECS AN

    US · usaspendingSource ↗
  2. Contract modified

    THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THE 35% DESIGN.

    US · usaspendingSource ↗
  3. Award announced

    THE PURPOSE OF THIS PROJECT IS TO COMPLETE A 100 DESIGN TO REMOVE THE EXISTING HIGH EXPANSION FOAM SYSTEM (HEFS) IN BUILDING 50 HANGAR 1 AND REPLACE WITH AN AUTOMATIC WATER SPRINKL

    US · usaspendingSource ↗
  4. Value increased

    THE PURPOSE OF THIS PROJECT IS TO COMPLETE A 100 DESIGN TO REMOVE THE EXISTING HIGH EXPANSION FOAM SYSTEM (HEFS) IN BUILDING 50 HANGAR 1 AND REPLACE WITH AN AUTOMATIC WATER SPRINKL

    US · usaspending$281.7KSource ↗

Auditable model output

Predictive intelligence

Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

Append-only source history

Source records

RecordDateStagesFetched