FIRMQUARRYResearch workspace

UK_FTS process · buyer country GB · planning

QEII Memorial Programme – Bridge Contractor

Department for Culture, Media & Sport

Procedure ocds-h6vhtk-078c4cCPV 45221113Construction
GBP 11,500,000
Data last updated Oct 22, 2026 · Source: Find a Tender OCDS
Buyer identifier
GB-PPON: PJGD-5581-JPGD
Primary supplier
Not reported
Procurement method
Not reported
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
GBP 11,500,000
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

Contracting authority: Department for Digital, Culture, Media and Sport (DCMS) Procurement title: QEII Memorial – Bridge Contractor Procurement identifier: 105266 Notice type: UK2 – Preliminary Market Engagement Notice Estimated contract value (excluding VAT): £11,500,000 - £13,000,000 Contract location: London, Inner London West, Westminster and City of London CPV codes: 45221113 – Footbridge construction work 45221115, 45223000, 45223210, 45223100, 45223110, 45341000, 45432112, 71322300, 45340000, 45000000 Expected tender notice publication: January 2027 Market engagement closing date: 31 December 2026 Procurement contact / portal: DCMS procurement portal Description of the requirement The Department for Digital, Culture, Media and Sport (DCMS) is undertaking preliminary market engagement in connection with the proposed procurement of a Bridge Contractor to supply works in respect of the Queen Elizabeth II Memorial programme. The proposed appointment will involve the specialist design validation, prototype development, fabrication, construction and installation of a bespoke pedestrian bridge forming part of a nationally significant memorial project in central London. The Bridge Contractor will be required to work closely and collaboratively with Foster + Partners, the appointed lead designer, and the wider design team to support technical design development and validation, prototype testing, fabrication detailing and the successful delivery of the bridge in accordance with the agreed design intent. The proposed scope comprises the complete integrated bridge package, including: structural stainless steel fabrication and associated components; specialist glass balustrades, including their supporting and fixing arrangements; incorporated paving, finishes and associated interfaces; structural and fabrication design validation; prototype manufacture, testing and technical refinement; detailed 3D and fabrication modelling; fabrication, assembly, transportation, lifting and installation; and associated temporary works, quality assurance and specialist supply-chain coordination. The works will be delivered within a sensitive public realm environment and will require particular attention to architectural quality, specialist craftsmanship, technical assurance, construction logistics, programme coordination and stakeholder interfaces. DCMS is seeking feedback from contractors capable of taking responsibility for the complete integrated bridge package, either through their own specialist capabilities or through appropriately managed specialist subcontractors. Indicative timescales The current indicative programme anticipates award of the Stage 1 Pre-Construction Services Agreement (PCSA) in May 2027 and the Stage 2 main fabrication and installation contract in February 2028. These dates are estimates and remain subject to procurement outcomes, programme development and DCMS approvals. The anticipated duration and completion date of the Stage 2 works will be determined during Stage 1 or as part of the formation of the Stage 2 contract. Proposed Procurement and Delivery Approach DCMS is considering a two-stage appointment for the specialist Bridge Contractor, with an initial Pre-Construction Services Agreement (PCSA) to support prototype development, testing, technical design validation and refinement, followed by a separate commitment to the principal fabrication and installation works. DCMS is considering a competitive flexible procedure under the Procurement Act 2023, with an open initial tender stage to encourage participation from the specialist market. The Bridge Contractor is expected to be appointed initially by DCMS, with the intention of subsequent novation of that contract to the Principal/Main Contractor, subject to agreed contractual arrangements and approvals. The proposed approach remains subject to market engagement, further consideration and DCMS governance approvals.

Suppliers

    Official lifecycle

    Process timeline

    1. Planned

      QEII Memorial Programme – Bridge Contractor

      GB · uk_find_a_tenderGBP 11,500,000Source ↗

    Auditable model output

    Predictive intelligence

    Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

    Append-only source history

    Source records

    RecordDateStagesFetched
    099210-2026Oct 20, 2026planningOct 21, 2026