FIRMQUARRYResearch workspace

UK_FTS process · buyer country GB · planning

UK1 Pipeline Notice NRW River Restoration All Wales Framework

Natural Resources Wales

Procedure ocds-h6vhtk-078b8fCPV 70332100Not reported
GBP 10,000,000
Data last updated Oct 22, 2026 · Source: Find a Tender OCDS
Buyer identifier
GB-PPON: PBBR-3628-MPRN
Primary supplier
Not reported
Procurement method
Competitive flexible procedure
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
GBP 10,000,000
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

This is a pipeline notice to alert the market to a forthcoming tender opportunity during Spring 2027. NRW is renewing its existing River Restoration All Wales Framework and aims to appoint multiple suppliers across multiple geographical lot areas to carry out a range of services. The work includes both in-river conservation actions and riparian interventions and management including but not limited ot the below: Placement of large wood, boulders and gravel to restore river habitats; Installation of leaky woody dams in river channels; River channel re-profiling and re-meandering to restore river habitats; Installation of small scale rock ramps to aid fish passage; Removal of hard bank revetment e.g gabions, block stone to restore natural banks; Removal of smaller scale weirs (e.g block stone weirs) and culverts; Removal or breaching of flood embankments for floodplain reconnection; Creation and improvement of floodplain habitats such as scrapes, ponds and other environmental enhancements. Use of bio-engineering materials such as coir rolls, willow faggots, coir matting and rock rolls may be required for elements of channel restoration works. Farm improvements to drainage and pipework Installation of mains and natural water supply troughs including the use of solar pumps. Farm works including concrete work, hard-coring gateways, roof water guttering, grey water harvesting Large scale river corridor stock fencing Tree planting Minor works including small culvert works and construction of footbridges Installation of angling platforms

Suppliers

    Official lifecycle

    Process timeline

    1. Planned

      UK1 Pipeline Notice NRW River Restoration All Wales Framework

      GB · uk_find_a_tenderGBP 10,000,000Source ↗

    Auditable model output

    Predictive intelligence

    Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

    Append-only source history

    Source records

    RecordDateStagesFetched
    098863-2026Oct 20, 2026planningOct 21, 2026