FIRMQUARRYResearch workspace

UK_FTS process · buyer country GB · planning

UKRI-6281 Transport of APA Shipping Frame Assemblies from Europe to USA

UK Research & Innovation (UKRI)

Procedure ocds-h6vhtk-078cb4CPV 63521000Not reported
GBP 1,462,000
Data last updated Oct 22, 2026 · Source: Find a Tender OCDS
Buyer identifier
GB-PPON: PDQJ-7126-JDHG
Primary supplier
Not reported
Procurement method
Not reported
Tender deadline
Not reported
Contract period
Not reported — Not reported
Native value
GBP 1,462,000
USD comparison
Not shown — no auditable FX observation
Official source
Open notice ↗

Description

UK Research and Innovation (UKRI) is undertaking Preliminary Market Engagement to inform the development of a forthcoming procurement for the international transportation of specialist scientific equipment. Interested suppliers are invited to review the accompanying information and complete the market engagement questionnaire The Deep Underground Neutrino Experiment (DUNE) is an international experiment for neutrino science and proton decay studies. The Long Baseline Neutrino Facility (LBNF) is the facility required for DUNE and once it is completed, it will comprise the world's highest-intensity neutrino beam (at Fermi National Accelerator Laboratory (‘FNAL’), Batavia, Illinois) and the infrastructure necessary to support massive, cryogenic far detectors installed deep underground at the Sanford Underground Research Facility (‘SURF’), 1300m underground, in Lead, South Dakota. The DUNE Anode Plane Assemblies (also named ‘APAs’) are the main detectors of the DUNE Horizontal Drift Experiment. They are built as large stainless-steel frames onto which prestressed copper-beryllium wires are winded in 4 layers. The APAs represent the detector part of the DUNE TPC. Most of the APAs are produced and assembled in the UK at STFC Daresbury Laboratory (DL), some are tested at CERN, therefore, they must be transported long distances from either the UK or CERN to Fermilab in the US where they are stored waiting for final transport and installation at SURF laboratory. The APAs are very complex and fragile detectors. If they would be damaged during their transport, the impacts on the cost and schedule could have serious consequences on the DUNE project. To mitigate this risk, two APAs are transported inside a transport frame (also named APA Shipping Frame ‘ASF’). The ASF is installed on wire rope absorbers (WRAs’) intended to dampen the shocks and vibrations from the transport and handling, and finally mounted on a base frame (BF). The ASF, WRAs and BF form the ASF Assembly. The Contracting Authority, UK Research and Innovation (UKRI) are looking to engage with suppliers before the full requirement is published for the marketplace to submit bid submissions. The contract is expected to be on a call off basis and there is no guarantee of the level of spend through this contract. However, it is anticipated approximately 68 shipments are required during the 4 year duration. We would like you to complete the following questionnaire to help us understand the marketplace interest - https://forms.cloud.microsoft/Pages/ResponsePage.aspx?id=juC3i6TajkqSfvyjjbBLfsxoERpCeehLn8lp5URh6C9UODcyTklFQk5YVk9PWVdBRE9VSkNERzEwNS4u

Suppliers

    Official lifecycle

    Process timeline

    1. Planned

      UKRI-6281 Transport of APA Shipping Frame Assemblies from Europe to USA

      GB · uk_find_a_tenderGBP 1,462,000Source ↗

    Auditable model output

    Predictive intelligence

    Predictive intelligenceInsufficient historyNo eligible point-in-time model has produced a prediction for this record.

    Append-only source history

    Source records

    RecordDateStagesFetched
    099410-2026Oct 21, 2026planningOct 22, 2026